There are several leak testing methods, tracer gases and leak detectors available. How can one identify the solution suited best for a certain application both from a technical and a financial perspective?
Leak testing projects normally begin with a lot of questions. But once you start analysing the progress of such projects you will see a typical structure.
Based on hundreds of successful leak detection projects we have identified seven key steps:
- Structured analysis
Checklist regarding both key technical and economical parameters of the specific project
- Proposal
Solution proposal following the project specification. The proposal will be worked out based on our application database and the Leakulator simulation tool.
- Proposal verification
Proving that the proposal is able to fulfil the given specification. Verification can be done based on tests in our leak detection lab, on-site tests or our reference database
- Preparation
Structured preparation of the working environment. Checklist regarding all necessary and recommend on-site preparations
- Training
Operator training both on the instrument but often more important on the application.
- Process optimisation
On-site assistance for improving efficiency and quality. Recommendations for cost of ownership reduction
- Maintenance
Preventive actions for maximum uptime
You have a leak detection project? Make use of our experience to define the optimal solution. Let's follow a proven process together!